{"id":1577,"date":"2024-02-19T11:10:45","date_gmt":"2024-02-19T11:10:45","guid":{"rendered":"https:\/\/cqic.org.uk\/?p=1577"},"modified":"2024-02-19T11:11:43","modified_gmt":"2024-02-19T11:11:43","slug":"countesswells-primary-school-quality-case-study","status":"publish","type":"post","link":"https:\/\/cqic.org.uk\/case-study\/countesswells-primary-school-quality-case-study\/","title":{"rendered":"Countesswells Primary School \u2013 Quality Case Study"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"

Projects which are handed over 3 weeks ahead of the contractual completion date, and with zero snags on the snagging list, are the exception rather than the rule. However, this level of success can be achieved as was demonstrated by the Countesswells Primary School, which was handed over to Aberdeen City Council by hub North Scotland and contractor Morrison Construction in March 2023.<\/p>\n

The Countesswells Primary School project is a 2-stream primary school (434 pupils) with<\/p>\n","protected":false},"author":4,"featured_media":1578,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[5],"tags":[],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/posts\/1577"}],"collection":[{"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/comments?post=1577"}],"version-history":[{"count":4,"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/posts\/1577\/revisions"}],"predecessor-version":[{"id":1583,"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/posts\/1577\/revisions\/1583"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/media\/1578"}],"wp:attachment":[{"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/media?parent=1577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/categories?post=1577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cqic.org.uk\/wp-json\/wp\/v2\/tags?post=1577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}